Crane ordered and arrived on time,complete with a rigger!
Jobs to do and in this order:
1-Lift steel main mast off
2-lift mizzen mast off
3-pull out motor and place on already made bearers.
4-pull out 2 fuel tanks[alreadt empty of fuel 300l left]
5-pullout 160lt hydraulic tank-also MT.
Then it is time to erect the 5 timber portals and brace for the shed over Mason Bay
Then time for a rest and beer!......
No comments:
Post a Comment