Got the sampson posts all bolted in and filled ready for touch-up paint. Made individual 3/8 copper bolts with 316 UNC nuts on inside and rivitted head on outside. Will use 2 10mm galv coach bolts thru deck to clamp below. Need these done ready to tie her up after re-launching. Still on target for Wed 18th...
No comments:
Post a Comment