
Drilled and installed the outlets and valves for trhe two rotomoulded 400lit water tanks. Working out a water collection system from the roof of the saloon and wheelhouse. Installing a pump to 60lit ss headertank on wheelhouse roof so gravity to galley-no pressure pumps.
No comments:
Post a Comment