Wheelhouse now back in original position.Rolled on pipe rollers.In correct location ans marked on the deck.Now lifted up as the bottom board will be cut off which will will remove all the old steel holding down bolts.This will be replaced and bolted down with copper.then lower the house and bolt the uprights to the cills---got it?
No comments:
Post a Comment